In May 2022, we started work at 95 Drayton Gardens, SW10 9QU; the work consisted of securing the below-ground level basement against water flowing in from the outside and the walls inside.
In May 2022, we started work at 95 Drayton Gardens, SW10 9QU; the work consisted of securing the below-ground level basement against water flowing in from the outside and the walls inside.